Cracks develop along 250m stretch of Dhaka Bypass in Sonargaon
4 October 2026
•
Transport
Suffering mounts on Pirojpur-Barguna road
3 October 2026
•
Transport
6 Paharika Express coaches detach in Lawachara, disrupting rail services
2 October 2026
•
Transport
Indefinite transport strike begins in Habiganj
1 October 2026
•
Transport
Habiganj transport owners call strike from tomorrow as row with Moulvibazar owners deepens
30 September 2026
•
Transport
2 ship collisions reported at Ctg port anchorages
29 September 2026
•
Transport
DTCA, Buet sign deal for Dhaka monorail study
29 September 2026
•
Transport
If bus owners want, Dhaka buses can be transformed in 3 months: Transport minister
28 September 2026
•
Transport
Launch fares rise before revised rates take effect
23 September 2026
•
Transport
Water transport fares raised by 7.54% after fuel price hike
23 September 2026
•
Transport
Rail link between Mymensingh and Netrakona suspended since 8am
The rail link between Mymensingh and Netrakona's Jaria has been suspended since 8:00am today following the derailment of a locomotive
24 September 2023
Bangabandhu Tunnel awaits inauguration; 98% complete, toll rates finalised
The main tunnel is fully equipped and prepared for vehicular movement. This historic project marks the country's first-ever underwater tunnel, and preparations for its grand inauguration are underway
24 September 2023
Padma Bridge: Toll collection crosses Tk 1,000cr
The toll collection from vehicles on Padma Bridge has crossed Tk 1,000 crore since its inauguration on June 25 last year
20 September 2023
Ferry service to be launched on Chilmari-Roumari route tomorrow
State Minister for Shipping Khalid Mahmud Chowdhury will inaugurate the ferry service on Chilmari-Roumari route on the Brahmaputra river in Kurigram tomorrow.
19 September 2023
Farmgate-Uttara: Bus ride smoother than ever
Alauddin Hossain endures long tailbacks during his daily commute but his yesterday’s experience was completely different.
18 September 2023
BRTC starts running buses on elevated expressway
Bangladesh Road Transport Corporation (BRTC) launched bus services on the Uttara-Farmgate route via the Dhaka Elevated Expressway on a trial basis this morning
18 September 2023
Uttara- Farmgate: BRTC buses to start using expressway today
The Bangladesh Road Transport Corporation (BRTC) will begin operating buses on the Uttara-Farmgate route via the Dhaka Elevated Expressway today.
17 September 2023
JS body asks road transport ministry to investigate why same contractors get jobs
A parliamentary watchdog today asked the Ministry of Road, Transport, and Bridges why the same contractors get jobs again and again
17 September 2023
BR conducts test run of goods train
A freight train of Bangladesh Railway successfully completed a test run between Bhanga and Mawa station via the Padma bridge yesterday.
16 September 2023
Padma Bridge rail link: BR conducts test run of goods train on Bhanga-Mawa route
A freight train of Bangladesh Railway successfully completed a test run between Bhanga and Mawa station via the Padma bridge today
16 September 2023
Mawa-Bhanga rail route: Speed limit test conducted
The Bangladesh Railway today tested the speed limit on the 42-kilometre Mawa-Bhanga rail line
15 September 2023
Trial run held on Akhaura-Agartala rail route
A trial run of a special train was conducted on the newly constructed Akhaura-Agartala rail route yesterday.
14 September 2023
50 years without a concrete bridge!
Residents of three unions in Narail Sadar upazila have not had a concrete bridge over the Kajla river in 50 years.
13 September 2023
Make sure it serves purpose: experts
Urban planning experts have urged the government to take measures to ensure the Dhaka Elevated Expressway serves its intended purpose and benefits the public.
13 September 2023
E-ticketing remains only on paper
E-ticketing for all buses in Dhaka was launched last year, first on Mirpur route and then on other routes for over 3,000 buses, aiming to bring discipline in the capital’s public transport sector and reduce conflicts between passengers and bus helpers over additional fares.
8 September 2023
Dhaka-Bhanga Line: Special train completes test run via Padma Bridge
The Bangladesh Railway yesterday ran the test run on the 82-kilometre Dhaka-Bhanga rail line via the Padma bridge.
7 September 2023
BR's test run: Special train from Dhaka reaches Bhanga via Padma Bridge
A special train operated by Bangladesh Railway on a test run reached Bhanga after a journey on the 82-km Dhaka-Bhanga line via the Padma Bridge today.
7 September 2023
Mawa-Bhanga: Test run of special train today
The Bangladesh Railway is going to start trial run of a special train on Mawa-Bhanga section crossing through the Padma Bridge today.
6 September 2023
20,000 posts vacant in Bangladesh Railway
Railways Minister Nurul Islam today told parliament that there are about 20,000 vacant posts in Bangladesh Railway
4 September 2023
Dhaka Elevated Expressway: Tk 18.5 lakh toll collected in 24 hours
More than 22,800 vehicles have travelled through the Dhaka Elevated Expressway in 24 hours till 6:00am today
4 September 2023